Client: Makkah Municipality
Overview: Preparation works were carried out to improve the quality of the concrete surfaces of the bridges using the sandblasting procedure. Components of the anti-carbonation protective coating system were mixed and applied to the prepared concrete surfaces following the instructions of the manufacturer.
© Copyright 2023 All rights reserved Sky Specialized Co. Ltd. Powered by Amtech